snippet:
|
NPS Cycle 5 Routes and Parking Conditions |
summary:
|
NPS Cycle 5 Routes and Parking Conditions |
extent:
|
[[-157.954293992,13.4044558210001],[145.728781049,63.7399221850001]] |
accessInformation:
|
Road Inventory Program:
EFLHD
22001 Loudoun County Pkwy.
Ashburn, VA 20147
(703) 404-6371
CFLHD
12300 West Dakota Ave.
Lakewood, CO 80228
(720) 963-3556 |
thumbnail:
|
thumbnail/thumbnail.png |
maxScale:
|
1.7976931348623157E308 |
typeKeywords:
|
["Data","Service","Feature Service","ArcGIS Server","Feature Access","providerSDS"] |
description:
|
<DIV STYLE="text-align:Left;font-size:12pt"><P><SPAN>RIP Cycle 5 (2010 - 2014)</SPAN></P><P><SPAN>This feature class is populated and maintained by RIP personnel. The polyline and polygon feature classes contain routes/areas for the parks driven by the Data Collection Vehicle (DCV) or manually collected by the RIP field team. This data is projected in GCS_WGS_1984 and any length or area calculations were performed in the appropriate UTM Zone falling within the majority of the park. </SPAN></P></DIV> |
licenseInfo:
|
|
catalogPath:
|
|
title:
|
C5PCR |
type:
|
Feature Service |
url:
|
|
tags:
|
["RIP","NPS","C5","USA","Conditions","Routes","Parking"] |
culture:
|
en-US |
name:
|
C5PCR |
guid:
|
8F3E86FE-8DBC-41F9-9AC8-0371344A0BC5 |
minScale:
|
0 |
spatialReference:
|
GCS_WGS_1984 |